Order Helpline 01752 692 760
Order Helpline 01752 692 760

Type X Intermediate Tray LH 23.5dg Long Lead

Code:
IL 23.5 T 4
Pack Quantity:
Price per :

This Type X Intermediate Tray, left-handed, is designed to dress directly over tiles. It is perfect for where tiles are compatible shapes, meaning they are not flat or minimally undulated. Repelling rainwater and stopping dampness from entering below the abutting roof line is n... Read More

£21.44 Incl. VAT
Earn points

SUPER rewards Earn points and save £££ on our SUPERSTORES

Find out more
Oops! Please select from the options
PayPal

Pay in 3 interest-free payments of £0.00

Learn more
Est. Delivery: 1-2 Working Days
Shipping costs displayed in basket.
We can let you know when this product is back in stock.

This product is proving to be very popular and has unfortunately sold out.

Enter your email below and we'll notify you as soon as this product is back in stock:

For delivery Tuesday, Dec 1st - order in:
days hrs mins secs
View Transport Policy

Next day delivery is subject to stock availability. If products on a 24 hours service are ordered alongside products NOT on a 24 hours service, this may delay your whole order.

All delivery charges are included in the final shopping basket and are dependent on the products Scottish Highlands & the Islands where additional shipping charges will apply.

Please note that not all products will incur an additional delivery charge to the Scottish Highlands & the Islands – this is based on the costs from the manufacturer, distributor or courier providing shipping on our behalf. If your delivery address is in the Scottish Highlands and Islands, a member of our helpline team will contact you prior to processing your order should an additional delivery charge apply.

While we make every effort to ensure orders are delivered by the date required, we cannot guarantee availability from the manufacturer or the manufacturer's delivery schedules.

Any variation to web delivery date given will be advised to you by email or telephone. If we are unable to make delivery because access is not possible, we reserve the right to make a failed delivery charge.

Create a wishlist

"Fulfilled their promises"

Marcus Franks

Description

This Type X Intermediate Tray, left-handed, is designed to dress directly over tiles. It is perfect for where tiles are compatible shapes, meaning they are not flat or minimally undulated.

Repelling rainwater and stopping dampness from entering below the abutting roof line is necessary for stepped and staggered gable abutments. External skins change to the internal skins below the roof line, hence why this is required. As for internal protection, the system prevents dampness inside skins, keeps dampness from seeping under critical stepped rooflines, and adds a weatherproofing element and flashes the physical roof/masonry junction.

Features & Benefits: Type X Intermediate Tray LH 23.5dg Long Lead

  • Left-handed intermediate tray designed to dress directly over tiles
  • 23.5° roof pitch long lead flashing perfect for tiles that are compatible shapes (non-flat or minimally undulated)
  • Repels rainwater and stops dampness at stepped and staggered gable abutments
  • External skins change to internal skins below the roof line
  • Prevents dampness inside skins
  • Protects against seeping under critical stepped rooflines
  • Adds weatherproofing and flashes the roof/masonry junction
  • One upstand end so water can drain out the open end

Details

Material
Polypropylene
Profile
Universal
Minimum Pitch
23.5 Degrees

Questions & Answers

There are currently no questions for this product.

Have a question about this product?

loading...

Product Enquiry Form

Type X Intermediate Tray LH 23.5dg Long Lead

*Required Field