Order Helpline 01752 692 760
Order Helpline 01752 692 760

Type X Intermediate Tray LH 35dg Long Lead

Code:
TYPE X/LH/LONG
Pack Quantity:
Price per :

This Type X Intermediate Tray is Left-Handed with a Long Lead flashing suitable for dressing directly over tiles. Suited to 35° pitched roofs, it is ideal for use when the tiles are appropriately shaped and not minimally undulated or flat. Every staggered and stepped gable abut... Read More

£18.92 Incl. VAT
Earn points

SUPER rewards Earn points and save £££ on our SUPERSTORES

Find out more
Oops! Please select from the options
PayPal

Pay in 3 interest-free payments of £0.00

Learn more
Est. Delivery: 1-2 Working Days
Shipping costs displayed in basket.
We can let you know when this product is back in stock.

This product is proving to be very popular and has unfortunately sold out.

Enter your email below and we'll notify you as soon as this product is back in stock:

For delivery Tuesday, Dec 1st - order in:
days hrs mins secs
View Transport Policy

Next day delivery is subject to stock availability. If products on a 24 hours service are ordered alongside products NOT on a 24 hours service, this may delay your whole order.

All delivery charges are included in the final shopping basket and are dependent on the products Scottish Highlands & the Islands where additional shipping charges will apply.

Please note that not all products will incur an additional delivery charge to the Scottish Highlands & the Islands – this is based on the costs from the manufacturer, distributor or courier providing shipping on our behalf. If your delivery address is in the Scottish Highlands and Islands, a member of our helpline team will contact you prior to processing your order should an additional delivery charge apply.

While we make every effort to ensure orders are delivered by the date required, we cannot guarantee availability from the manufacturer or the manufacturer's delivery schedules.

Any variation to web delivery date given will be advised to you by email or telephone. If we are unable to make delivery because access is not possible, we reserve the right to make a failed delivery charge.

Create a wishlist

"Cedar wood roof shingles"

Daisy girl

Description

This Type X Intermediate Tray is Left-Handed with a Long Lead flashing suitable for dressing directly over tiles. Suited to 35° pitched roofs, it is ideal for use when the tiles are appropriately shaped and not minimally undulated or flat.

Every staggered and stepped gable abutment must be assembled with a cavity tray to prevent dampness and rainwater from penetrating below the abutted roof line. This cavity tray steps up between the inner and outer leaves to create a gutter which channels the water to the exterior.

Features & Benefits: Type X Intermediate Tray LH 35dg Long Lead

  • Left-handed
  • Built into each course up the rake of the roof
  • End upstand so water can only discharge via the open end of the tray
  • Long lead flashing for dressing directly over roof tiles
  • Suited to 35° pitched roofs

This Type X system fulfils three basic requirements: preventing the inside skin from becoming damp, externally weatherproofing and flashing the physical roof/masonry intersection and stopping dampness from penetrating below the critical stepped roof line.

Details

Material
Polypropylene
Profile
Universal
Minimum Pitch
35 Degrees

Questions & Answers

There are currently no questions for this product.

Have a question about this product?

loading...

Product Enquiry Form

Type X Intermediate Tray LH 35dg Long Lead

*Required Field