Order Helpline 01752 692 760
Order Helpline 01752 692 760

Type X Intermediate Tray RH External Angle 35dg Long Lead

Code:
AER 35 T4
Pack Quantity:
Price per :

Perfect for traditional and timber frame setups with a 75mm standard brickwork coursing, this Type X Intermediate Cavitray will bring reliability to your building project. When dealing with corners, you can use this Right Hand External Angle instead of a catchment tray. Suitab... Read More

£31.54 Incl. VAT
Earn points

SUPER rewards Earn points and save £££ on our SUPERSTORES

Find out more
Oops! Please select from the options
PayPal

Pay in 3 interest-free payments of £0.00

Learn more
Est. Delivery: 1-2 Working Days
Shipping costs displayed in basket.
We can let you know when this product is back in stock.

This product is proving to be very popular and has unfortunately sold out.

Enter your email below and we'll notify you as soon as this product is back in stock:

For delivery Tuesday, Dec 1st - order in:
days hrs mins secs
View Transport Policy

Next day delivery is subject to stock availability. If products on a 24 hours service are ordered alongside products NOT on a 24 hours service, this may delay your whole order.

All delivery charges are included in the final shopping basket and are dependent on the products Scottish Highlands & the Islands where additional shipping charges will apply.

Please note that not all products will incur an additional delivery charge to the Scottish Highlands & the Islands – this is based on the costs from the manufacturer, distributor or courier providing shipping on our behalf. If your delivery address is in the Scottish Highlands and Islands, a member of our helpline team will contact you prior to processing your order should an additional delivery charge apply.

While we make every effort to ensure orders are delivered by the date required, we cannot guarantee availability from the manufacturer or the manufacturer's delivery schedules.

Any variation to web delivery date given will be advised to you by email or telephone. If we are unable to make delivery because access is not possible, we reserve the right to make a failed delivery charge.

Create a wishlist

"Impressive delivery time and great…"

David Kelsall

Description

Perfect for traditional and timber frame setups with a 75mm standard brickwork coursing, this Type X Intermediate Cavitray will bring reliability to your building project. When dealing with corners, you can use this Right Hand External Angle instead of a catchment tray. Suitable for 35° roof pitches, it seamlessly fits abutment ends and returns, forming a smooth connection with horizontal trays when needed.

Designed for suitably shaped tiles, which are not flat or minimally undulated, this Type X Intermediate Tray with Long Lead flashing ensures a secure, weather-resistant finish and will dress directly over your roof tiles.

Features & Benefits: Type X Intermediate Tray RH External Angle 35dg Long Lead

  • Perfect for traditional and timber frame constructions with 75mm standard brickwork coursing
  • Suitable for 35° roof pitches
  • External angle for right-hand corners
  • Replaces catchment trays and links with horizontal trays
  • Includes long lead flashing for dressing over roof tiles
  • Specifically designed for suitably shaped tiles (not flat or minimally undulated)
  • Ensures a secure, weather-resistant finish
  • Provides efficiency and quality for your project
  • Ideal for gable abutments

Details

Material
Polypropylene
Profile
Universal
Minimum Pitch
35 Degrees

Questions & Answers

There are currently no questions for this product.

Have a question about this product?

loading...

Product Enquiry Form

Type X Intermediate Tray RH External Angle 35dg Long Lead

*Required Field